Mir Ali Rahimizad, in an interview with the reporter of Mehr, stated: The Suspension Bridge of Moshgin is a complex of amenities, tourism and sports, which phase is added to the infrastructure of its circulation.
He added that in addition to the existing facilities, the construction of the city of play, the infrastructure of the canoe, the natural park and the largest cinema and amphitheater in the northwest of the country are projected.
According to the Governor of Meshgin, the country's largest zipper, with three simultaneous users, is also being built as the newest tourist infrastructure in the complex.
Rahimizade said that about one billion and 500 million dollars have been spent on the zip line equipment, said the zipper equipment was designed in Tabriz Machine and its installation has begun.
The Governor of Mashhine City stressed that this possibility will be possible by private sector investment and will be operational by the end of April.
Rahimizad pointed to the significant impact of private sector investment in the tourism boom of the city and said that we have seen examples of these effects on Nowruz holidays.
He added: "During the Norouz holiday, overnight stays with 78 percent growth and visits to tourism infrastructure with 110 percent growth compared to the current year.
Governor of Mashhink City recalled: Last year, 200 billion USD of private sector investment in Meshgin City was realized, of which 150 billion USD was attributed to the mineral water tourism sector.